A second new nuclear reactor is completed in Georgia. The carbon
ATLANTA (AP) — The second of two new nuclear reactors in Georgia has entered commercial operation, capping a project that cost billions more and took years longer than originally projected.
Georgia Power Co. and fellow owners announced the milestone Monday for Plant Vogtle’s Unit 4, which joins an earlier new reactor southeast of Augusta in splitting atoms to make carbon-free electricity.
Unit 3 began commercial operation last summer, joining two older reactors that have stood on the site for decades. They’re the first two nuclear reactors built in the United States in decades.
The new Vogtle reactors are currently projected to cost Georgia Power and three other owners $31 billion, according to calculations by The Associated Press. Add in $3.7 billion that original contractor Westinghouse paid Vogtle owners to walk away from construction, and the total nears $35 billion.
Related articles
French sports minister calls for sanctions after Monaco player tapes over anti
PARIS (AP) — France’s sports minister has called for soccer club Monaco to be sanctioned after one o2024-05-21Real Madrid hosts Barcelona eyeing decisive blow in Spanish league title race
BARCELONA, Spain (AP) — Real Madrid faces one last stumbling block in its waltz toward the Spanish l2024-05-21Rybakina ends Swiatek's Stuttgart reign in 3
STUTTGART, Germany (AP) — Elena Rybakina defeated top-ranked Iga Świątek 6-3, 4-6, 6-3 to reach the2024-05-21Pakistani province issues flood alert and warns of heavy loss of life due to glacial melting
PESHAWAR, Pakistan (AP) — A Pakistani province has issued a flood alert due to glacial melting and w2024-05-21Sweden beats France, Britain relegated after losing to Norway at hockey worlds
PRAGUE (AP) — Sweden beat France 3-1 to preserve a perfect record at the ice hockey world championsh2024-05-21Ukrainian president orders demobilization of conscripts
KIEV, March 7 (Xinhua) -- Ukrainian President Volodymyr Zelensky on Thursday signed a decree to disc2024-05-21
atest comment